Baytree Leeds
Site has reached practical completion
Units immediately available
Buildings
76,509 sq ft
330,000 sq ft build to suit opportunity also available
Baytree Leeds has one 76,509 sq ft high specification industrial / warehouse unit available and a 330,000 sq ft build to suit opportunity.
Baytree Leeds offers the best in class specification, built to BREEAM “OUTSTANDING”, EPC – “A” and WELL Ready standards.
Key Baytree Edge features
- The use of air source heat pumps negates the need for gas usage
- Bespoke sensor suite portal assists in the creation of a healthy working environment
- Super tight airtight insulated building envelope to reduce heating requirements
- Reindeer moss walls in the reception areas improve air quality and absorb noise
UNIT 1 76,509 SQ FT
| SQ M | SQ FT | |
|---|---|---|
| Warehouse | 6,361 | 68,480 |
| Offices | 746 | 8,029 |
| Total (GIA) | 7,108 | 76,509 |
| Pallet Racking | Wide Aisle | VNA |
|---|---|---|
| 4,980 | 6,564 |
- 12.5m clear internal height
- 8 dock level loading doors
- 2 level access loading doors
- 70 car parking spaces (inc 5 disabled and 10 EV)
- 37 overflow car parking spaces
- 10 Cycle spaces
- 50KN floor loading
UNIT 2 329,583 SQ FT
| SQ M | SQ FT | |
|---|---|---|
| Warehouse & Undercroft | 28,686 | 308,776 |
| Offices | 1,478 | 15,909 |
| Hub Office (2 storey) | 438 | 4,715 |
| Gatehouse | 17 | 183 |
| Total (GIA) | 30,619 | 329,583 |
| Pallet Racking | Wide Aisle | VNA |
|---|---|---|
| 44,520 | 59,456 |
- 15m clear internal height
- 28 dock level loading doors
- 4 level access loading doors
- 384 car parking spaces (inc 19 disabled and 38 EV)
- 50 Cycle spaces
- 62 HGV spaces
- 50KN floor loading
Drive times
| Leeds Freight Terminal | 100 yards |
| M621 J7 | 1 mile |
| M1 J44 | 1.2 miles |
| Leeds Train Station | 3 miles |
| M62 J29 | 4 miles |
| Leeds Bradford Airport | 12.3 miles |
| Sheffield | 32 miles |
| Manchester | 46 miles |
| Birmingham | 116 miles |
| London | 192 miles |
Baytree Edge features
- Offices constructed with the flexibility to increase office areas or provide for ancillary uses if required
- Underground ducts are installed in the service yards and car parks allowing for additional future installations
- Provision of underground ducts and drainage facilitate future expansion or reconfiguration of the office areas
- Dock faces are designed to accommodate a wide variety of vehicle types
- Electric vehicle charging stations are provided
- The use of air source heat pumps negates the need for gas usage
- Enhanced use of recycled and recyclable materials specified using Circular Economy principles
- Super tight airtight insulated building envelope to reduce heating requirements
- 10% rooflights to the warehouse roofs
- Roof mounted solar PV systems power wall
- mounted batteries in the reception areas producing night time power
- Permeable paving is used in external areas to mitigate shock charging the site drainage systems in storm conditions
- Reindeer moss walls in the reception areas improve air quality and absorb noise
- A CO2 absorbing “City Tree” is installed at the site entrance which doubles as a signage totem
- BIM models hold digital reproductions of building data which facilitate the Operation and Maintenance of the buildings
- Remote access is provided to the building management systems
- Solar powered USB charging benches are provided to external areas
- Sensor suites are installed to continuously monitor:
- Lighting energy usage
- Office areas heat mapping
- Office & Warehouse occupant numeration via 4D sensor
- Office Indoor air quality – C02 Levels
- Office indoor temperature
- Office indoor humidity levels
- External Air Quality
- External Noise levels
- Outdoor multipurpose recreational and relaxation areas are provided for occupiers of the estate
- Bike shelters are installed which include provision for electric cycle charging points to be powered by solar PV via battery storage
- Translucent panels are installed over the dock faces to introduce natural light to the internal marshalling areas in the warehouses
- Refreshment stations are provided in the reception areas